Nuclear evidence traceability / 01

Every nuclear item. Traced to its evidence.

DjedCore links every nuclear item to the evidence that makes it acceptable, across the owner, the EPC contractor, vendors and subcontractors. Independent licensing and quality services today, and licensed desktop software that keeps your records on your own systems.

LinkCheckRecordExport
DJED / Eight layers of traceabilityMODEL VIEW
  1. L8Evidence recordsOpen
  2. L7Inspection and test plansSatisfied
  3. L6Specifications and issued-for-construction drawingsSatisfied
  4. L5Codes and standardsSatisfied
  5. L4Design basisSatisfied
  6. L3EPC contractSatisfied
  7. L2Licence and licence conditionsSatisfied
  8. L1Law and regulationSatisfied
Synthetic example dataL1 → L8
01 · LinkBind each item, lot or serial number to its requirements and its evidence.
02 · CheckEvaluate readiness gates for every work package. Blocked is derived, never typed in.
03 · RecordKeep every change as a tamper-evident, hash-chained event.
04 · ExportIssue a scoped evidence package that a reviewer can verify independently.

01 / L1 → L8

Eight layers of traceability

Every requirement on a nuclear item descends through eight layers, from national law to a single test record. The software keeps each layer linked to the one above it, so a change at any level shows where it lands.

See the software
  1. L8Evidence records
  2. L7Inspection and test plans
  3. L6Specifications and issued-for-construction drawings
  4. L5Codes and standards
  5. L4Design basis
  6. L3EPC contract
  7. L2Licence and licence conditions
  8. L1Law and regulation

02 / The traceability gap

Records break where one company hands work to the next.

On a nuclear project, the owner, the EPC contractor, vendors and their subcontractors each keep their own records. A component can arrive on site, pass a visual check and still not be installable: its certificate covers another heat number, its drawing was revised after the factory test, or a sub-tier supplier's record never reached the EPC. The schedule says ready. The evidence does not. Too often the regulator finds the gap first.

  1. Subcontractor
  2. Sub-tier records never arrive
  3. Vendor
  4. Certificates without a clear scope
  5. EPC contractor
  6. Revisions out of step
  7. Owner / licensee
  8. Too much, or too little, sent
  9. Regulator
  • 01

    Traceability gaps

    A drawing revision supersedes the one a test was run against. Every record checked against the old revision is now in doubt, and no system says so.

  • 02

    Schedule blindness

    The schedule shows a work package ready to start. It does not know a hold point is still open or a welder's qualification expired last week.

  • 03

    Late regulatory surprises

    Gaps that could have been closed in the factory are found at inspection, when fixing them costs months.

03 / Three frameworks, three questions

Six layers, eight layers, nine gates. Each answers a different question.

  1. E1 → E6

    Six evidence layers

    Can this item be accepted for this use?

    DjedCore's evidence model for a single component: identity, provenance, requirements, quality evidence, physical status and acceptance.

  2. L1 → L8

    Eight layers of traceability

    Where does each requirement come from?

    The regulatory hierarchy, from law and licence down to the evidence record.

  3. MAT → REG

    Nine readiness gates

    Can this work package proceed?

    Material, engineering, quality, workforce, equipment, work area, prerequisite work, permit and regulatory conditions.

The six layers are a DjedCore framework, not an industry standard. Applicable acceptance criteria and authorised review remain decisive.

04

Nine readiness gates

A work package is Ready when every mandatory gate is satisfied or formally waived. Otherwise it is Blocked, with one reason for each open gate. Blocked is derived from the gates, so it can never disagree with them.

  1. MAT

    Material

  2. ENG

    Engineering

  3. QA

    Quality

  4. WRK

    Workforce

  5. EQP

    Equipment and tools

  6. ARE

    Work area

  7. PRE

    Prerequisite work

  8. PER

    Permit

  9. REG

    Regulatory

05

Two ways we help

Why DjedCore

Most nuclear licensing tools are built by software engineers who learned the regulations. DjedCore was built by a licensing engineer who learned software. Every finding traces to an objective record, not to AI inference or a consultant's memory.

Why DjedCore is different

What the software does

  1. 01

    Link

    Bind each item, lot or serial number to its requirements and its evidence.

  2. 02

    Check

    Evaluate readiness gates for every work package. Blocked is derived, never typed in.

  3. 03

    Record

    Keep every change as a tamper-evident, hash-chained event.

  4. 04

    Export

    Issue a scoped evidence package that a reviewer can verify independently.

06 / Canonical data model

One component. Six evidence layers.

Identity, provenance, requirements, quality evidence, physical status and acceptance answer different questions. A single status field cannot answer all six, so the model never collapses them into one.

Explore the data model
IdentityPart number · specification and grade · manufacturer · heat/lot/serial · quantity
ProvenanceManufacturer · sub-tier suppliers · distributors · purchase orders · shipments · custody transfers
RequirementsApproved requirements · safety classification · codes and standards · acceptance criteria · hold and witness points
Quality evidenceCertificates · inspection and test records · nonconformance reports · document revisions
Physical statusLocation · receipt · preservation and storage · quantity on hand · installed position
AcceptanceAccepted for a specific use · outstanding blockers · readiness forecast

08 / Why we exist

Vision

Every nuclear component can show what it is, how it was made and whether it is acceptable for its exact place in the plant, without chasing records by hand. New reactors are licensed on verified evidence instead of last-minute paperwork.

Mission

We close the traceability gap between owners, EPC contractors, vendors and subcontractors, so that the evidence licensing depends on is complete, consistent and verifiable. We do this through independent licensing and quality services, and through licensed desktop software that runs on our clients' own systems, backed by our technical support.

Read our vision, mission and values

09

Research and publications

Multi-case study

The Documentation Trap: Nuclear Projects That Lost Years and Billions

Seven projects, including Olkiluoto 3, Flamanville 3, Hanhikivi 1 and V.C. Summer, together with Korea's 2012–2013 certificate scandal, and what their documentation failures have in common. It ends with a red-flag checklist for your own licence file.

Publishing soon

Research paper

Regulated-Sector Information Entropy

A physics-informed framework for stakeholder dynamics and supply-chain resilience in the nuclear ecosystem. It sorts project information into layers from public to classified, scores how evenly information is spread with an entropy measure, and models stakeholders as a multiplex network of material, financial, regulatory, information and political links.

Preprint in preparation

All research

Have a licence file, a supplier or a work package you are worried about?

Send a short description. We reply within two working days and sign your NDA before any document changes hands.

Get started Email us contact@djedcore.com